which type of foundation are most prefarable in blockcotton
soils

Answers were Sorted based on User's Feedback



which type of foundation are most prefarable in blockcotton soils..

Answer / vidyasagar daley

most probebly two foundations are suitable those are :1)
pile fondation,
2)raft foundation.
bath foundations are very suitable.
why do you using pile or raft foundation?
ans) becuase of actually soil conditions changes with
climatical conditions so that reasons otherwise due to the
setelements in the soil the the structure may be failed.

Is This Answer Correct ?    10 Yes 0 No

which type of foundation are most prefarable in blockcotton soils..

Answer / priyanka

Pile foundation..

Is This Answer Correct ?    6 Yes 3 No

which type of foundation are most prefarable in blockcotton soils..

Answer / ankit

Under reamed pile foundation is used when black cotton soil.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

For raft 3000mm thickness with T25150 mesh reinf in top and bottom what diameter can be used for chair to support mesh reinforcement

4 Answers  


What is the life of reinforcement?

3 Answers  


Clarify the out turn of steel fixer in construction field

2 Answers  


the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this

4 Answers  


how can we find out the ratio of cement and sand in plastering

2 Answers  






explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting

0 Answers   ACME,


how calculate the cube strength in percentage

1 Answers  


in moon night and stars r shining with moon n u stand n lloking towards sky if u have no copass, and no any other civil lab equipment, then how u point out the North direction for serveying??

2 Answers  


What is the Laplenth for Reinforcement for Verticl and horizontal Structures as per IS code?

4 Answers   DLF, L&T,


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

0 Answers   MES,


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

0 Answers   Ranka Group,


what is the meaning of morth

1 Answers   L&T, Maytas,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)