2nd and 4rt angle elevation used in which country ?
No Answer is Posted For this Question
Be the First to Post Answer
how to identify different types of soils in field?
What is the diffrence between plinth/basement and plot area
providing, fixing, removal of pockets of size 100*150*300mm to 500*600*1000mm for foundation. the shuttering material used for making &fixing of pockets shall be removed by the contractor without damaged to pockets. if any damage occurred, the same shall be rectified by the contractor is to handover the pockets to forge shop engineer with proper marking of centre lines, levels etc.
in design case of structural member best suitrable percentage of steel limit is what
how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
WHY DID YOU CHOOSE THIS CARRIER?
what is the minimum % of steel use in columns ?
Why size of brick used at site is different from its standard size ?
what are the types of dimensioning?
Diagonal check is required for a layout work to confirm ––
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)