PERT Chart
Answer / piyush singh
A PERT chart is a graphic representation of a project’s
schedule, showing the sequence of tasks, which tasks can be
performed simultaneously, and the critical path of tasks
that must be completed on time in order for the project to
meet its completion deadline. The chart can be constructed
with a variety of attributes, such as earliest and latest
start dates for each task, earliest and latest finish dates
for each task, and slack time between tasks. A PERT chart
can document an entire project or a key phase of a project.
The chart allows a team to avoid unrealistic timetables and
schedule expectations, to help identify and shorten tasks
that are bottlenecks, and to focus attention on most
critical tasks.
Is This Answer Correct ? | 3 Yes | 0 No |
What is horizon or horizontal mining?
which Indian standerd code is used for billing
4 Answers Desai Construction, DLF, NKG Infrastructure,
what is a louer? and for which purpose it will be used.
How to make a c++ program that converts any base to base 10?
In colomn reinforcement when dia of bar is going to change, than what should be the lap length of bars weather it should be of heigher dia bar lap length or it should the accordance with new dia bar. the grade of concrete is same.
why we provide plastic sheet under lean concrete/pcc.?
which tests for concrete pouring period at the site?
can i get hindi version of is codes based on civil engineering?
0 Answers Cosmos, H Reck Engineers,
What is the meaning of Fe415 ?
6 Answers Arul Constructions, L&T, SSM,
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
What are the different types of foundation?
Which IS Code describe the industrial flooring?