How can u prepare mix design for concrete?
Answers were Sorted based on User's Feedback
Answer / md murtuza ali
concrete mix are of many types ,generally for domestic construction we use M20 grade of concrete where 'M' is the mix
of ingredients such as cement, agrregates(fine and coarse) and water and '20'refers to compressive strength of concrete for 28 days of curing with water.
steps invovlved in concrete mix are
1)collecting raw materials such as cement (43 grade or 53 grade),fine agrregate(sand)and coarse aggregate(gravel or stone)
2)batching:-weighing of all the raw materials the ratio of M20 grade of concrete should be (1:1.5:3) which means 1 part of cement,one and half part of sand and three parts of gravel with water by water cement ratio.
3)the water cement ratio should be 0.45 of all mix
4)mix the all ingredients such as cement ,affregates and water.
5)after mixing the freshly mixed concrete should be used for its application .the initial setting time of concrete is 30 mins and final setting time sholud be less than 10 hrs.
so this was about the mix design for M20 concrete.
Is This Answer Correct ? | 42 Yes | 8 No |
can you provide a link for manual design of building?
What is the difference between BC and SDBC
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
In which year onward limit state method used in india...
how to calculate shuttering design & position & quantity of props & type of method for succsessful work
what do you mean by punching shear?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What will you do if you encounter problems like accidents?
Definition of plinth beam & Uses.
what is the shuttering normal clear cover for footings, walls, beams & columnms
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
what is concrete canvas?