what is the criteria for the finalisation of pavement
thickness in road project?
Answer / er gulzar ahmad
To Finalize the pavement thickness in road projects,it is
mandatory to know the CBR value of the subgade and traffic
data
| Is This Answer Correct ? | 0 Yes | 0 No |
Aptitude, reasoning, quants, verbal and technical question
how to calculate the steel for rcc slab 1100 Square feet
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
what is the formula of calculating number of bars?
I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
0 Answers HR Construction, JP Group,
what is grid line? why are we provided small dia reinforcemen in slab against beam n column?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
how we can find sieve #4 is 4.75mm?
L/3 and l2 and 1.5l is use for reiforcement
how many brick sand cement require (1:5) 1 cum
On concrete surface 1sq.ft area hacking no's of hack?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)