57. Calculate the volume of a truck loaded with stone
chips whose data are as follows–
5
Top Length - 13-9, 13-10, 13-09
Bottom Length - 13-11, 13-10.5, 13-10
Top width - 8-7.5, 8-8, 8-7
Bottom width - 8-7, 8-8, 8-7.5
Depth - 2-0, 1-11.5, 1-10, 1-11, 1
-10.5, 1-11.75, 1-11
No Answer is Posted For this Question
Be the First to Post Answer
Where is lap in top & bottom beam
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
pls can some one tell me details of coloumn shuttering like at what distance the supports should be palace and no. of supports
what is meant by concrete joints?
Define aligned dimension?
what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the use of array command?
Why we check specific gravity of admixture when we receive it? What is it's significance.
why we create short columns under grade slab?
how to calculate sand in CFT from a concrete foundation (m^3)???