NP3 CLASS HUME RCC PIPE
Answer / sjtbehera
according to IS 455-1988
NP-3, is cateogrised as reinforced concrete medium duty
that is used in culverts carrying medium traffic
Is This Answer Correct ? | 1 Yes | 2 No |
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
0 Answers Era Infra Engineering, Tricom,
how many weight of 1Cum Sand ???
when we workout quantities of reinforcement steel , whate are the critari of lap length for column
deshuttering time for RCC for DPC over the foundation.
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
How do we calculate the power of centrifugal pump?
Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
What is the Roll of Water Bonding under VDF road?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
What is costing in 100squre feet bricks