Dear Sir,
I work in hydro project. I want to hire Scorpio/ Bolero on
monthly basis. But how can i justified its amount (Hourly
basic). Please solve my problem
No Answer is Posted For this Question
Be the First to Post Answer
how many express way in india
Why curing is necessary for concrete
Explain the design for rcc multi-storied building?
it is possiblee to produce concrete with out cracks...
How many no of bricks form 1 cum? How many no of solid blocks form 1 cum?
how can i come to same questions after get answer of one question from table,because if i click for one answer and after get the answer i try to come back on same questions i cant access them the questions change, it break up my link and i jummp here and there so plz tell me the way by which i can back to the same page of questions so can continoue my proper notes thanx
As a proof of my analytical skills I was asked to give an example of a real life situation that i have solved analytically ? Can anybody give me a clue what kind of examples should be a suitable answer ?
Please give a brief description of centre of gravity
what is the definition of stress& strain.
In Fe415 & Fe500,What is mean by "Fe" and "415/500"?
12 Answers CMR, Modi Builders, Taehwa Enterprises, vvip,
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
how many blocks required for 100sqft 8" blocks