Dear Sir,
I work in hydro project. I want to hire Scorpio/ Bolero on
monthly basis. But how can i justified its amount (Hourly
basic). Please solve my problem
No Answer is Posted For this Question
Be the First to Post Answer
How do you calculate reinforcement weight of steel?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is standard sand? What is coarse & fine sand? What is foundation? What is the seze of hooks in various Reinforced section? What is the formula of providing clear cover? What is the basic diff. between working stress & Limit state design? What is &cbc and fck? what are the primary & secondary test of water purification?
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
I s code of steel
how many no of cement bags required for 1:4 plastering for 100 sqft? how many no of cement bags required for 1:3 plastering for ceiling for 100 sqft?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
0 Answers Ascent Constructions,
how we can estimate the M50 concrete for foundation?
toothpaste is non-newtonian or newtonian
percentage of wastage limits in construction materials EX : min & max . cement = fine aggregate = coarse aggregate = admixture = wood = tiles = painting = marbles = bricks =
what is the tensile strength of 10swg and 8swg gabion wire?
What are segregation and bleeding?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)