Describe the sections included in a typical bill of quantities
No Answer is Posted For this Question
Be the First to Post Answer
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
How much paint is required for 1sqm.?how to calculate the paint...?
1 Answers MRKR, Sumadhura Infracon,
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
Factor of safety for steel should be based on its yield stress or its ultimate stress and factor of safety for concrete should be based on its ultimate stress or its yield stress?
what are the five benefits of using standard terminology in the measurement process?
which type of crust is best suitable to develop flexible pavement in rural roads i.e either with wet mix macadam or Water Bound Macadam and its reasons.
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
Pls. help. If a contract was awarded to a contractor in april 2012 with steel & cement base price as rs. 45/kg & 250/bag. Now in oct. 12 steel cement price becomes 55/kg & 290/ bag. How escalation will be calculated? Pls. tell complete calculation Regards,
What is "L" provided at the base of column??
What is The meaning Of Auto cad And Also Define What Is Drawing According To You
what is general scouring?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.