Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


is there a different b\w ground fault CB and earth leakage



is there a different b\w ground fault CB and earth leakage..

Answer / s.sundar rajan.

Yes, there is diff. Ground fault means it is a dead short
of the line into the ground terminals and whereas the earth
leakage means it is not short, it is due to leakage b/w
connectors or line to neutral or poor insulation of the
conductor which has leakage current will flow to earth.

Is This Answer Correct ?    8 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

why the star delta motors burn out frequently

1 Answers  


how much current a 100 sq mm busbar will carry?

1 Answers   ABB,


why synchronous motor is not self starting

5 Answers   Cenored,


what is the main difference between simplex RTD and Duplex RTD?

6 Answers  


WHY POLARITY TEST OF CT IS VERY IMPORTANT IN SWITCHGEAR

3 Answers   Birla, Reliance,


For load of 1 nos 3 TR Air Conditioners,6nos of 60 Watt Tibe Lights, 2 nos 200 W Outdoor Lights,1 no Coffee maker.All may work at the same timehow do I select DG Set Rating ,pLease advise the calculations

1 Answers  


We have ONLINE UPS 15KvA (3PHASE 440V I/P,3PHASE O/P,440V) I want to step down from 440 to 220 V What to do. Pl. suggest with specification.

1 Answers   ARDE,


WHY CAPACITOR IS NOT USED FOR THREE PHASE MOTORS DURING STARTING

1 Answers   Quest,


name the famous power plants present in A.P

1 Answers   Power Grid,


33kv substation lay out details & line to line & line to earth measurements

0 Answers  


We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.

0 Answers  


why core losses are affected with change in voltege in transformer?

1 Answers   HCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)