How can get electrical c licence.Now i am working in spining
Mill , transformer capacity 2750kva. Sanction demand 2250kva.
Please advise me . My contact no 09944226823
Answers were Sorted based on User's Feedback
Answer / santoshvarma
Electrical license first depends on the voltage on which u r
working, whether it is LT or HT voltage, if it is HT voltage
depends on whether it is 3.3KV, 6.6KV, 11KV, 33KV, 66Kv,
132KV, 220KV or 400KV. You should minimum experience of 1
year in the relevant feild, and you to submit the exp
details along with your study certificates and identity and
address proof in electrical office. And after verifying they
will call for Technical interview, if you clear that..u will
be getting the licence within 2months.
Is This Answer Correct ? | 118 Yes | 9 No |
Answer / ramarao
These are the following procedure for obtaining the
Electrical utility supervisor permit from AP electricity
license board,Mint compound Hyderabad.
1) He should have minimum 1 year experience in the relevant
feild,
2) Obtain the First Aid certificate from ST JOHN AMBULANCE
KOTI Hyderabad.
3)Obtain the service and No Objection certificate from
current industry.
4)Attested by gazetted officer of all educational certificates.
5)Obtain the application form from Mint compound hyderabad.
6)Take the chalana from State bank (Tresary)at ABIDS an
amount of 350/-
7)Submitt the application form with all relavent documents.
8)After that they will call for Technical interview and sent
the licence book.
Is This Answer Correct ? | 102 Yes | 7 No |
dear sir ..
I completed diploma in electronics and communication engineering.how can get electrical c licence.now i am working in NTTF collage in electrical maintenance..please tell me about this..
Is This Answer Correct ? | 2 Yes | 6 No |
Answer / jack
yes Rama Rao, actually i am going to hear that a sum of rupees 200000 have to pay when it will be. please suggest me
Is This Answer Correct ? | 0 Yes | 6 No |
why the supply power frequency is 50hz in india? where as it is 60hz in US?
Cummins 750 KVA generator how much disel consumed per hour and how many units generated on 100% full load.
How are calculated the aluminium busbar cross section area?
what is the Excaste meaning of CT Saturation?? 10 P 20, 15 VA, what is the meaning of 10, & 20. if the CT polarrity changed what will happened?? what is the differece between measuring CT & Protection CT?? what is the Saturation Point of measuring CT & Protection CT??
funtion of choke
What is the phase relationship between the primary and secondary voltages of a transformer?
what is difference between DC and Ac
what is difference between fuse and circuit breaker?
wchich motor we are using in mixer?
why transformer not work in dc
What is the fundamental cause of transients in power system?
hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz