1m=3.281feet in that what is .281 mm cm m or anyother
Answer / vishal r
1 M = 3.281 Ft
So, obviously 0.281 is in feet only.
If you want to convert in to inch then
0.281 Ft = .281*12 = 3.37 Inches.
Is This Answer Correct ? | 17 Yes | 0 No |
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?
1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX? 2.WHAT IS MEANT BY STRUCTURAL DESIGN? 3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER? 4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM THE LOAD COMBINATION? 5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP? 6.FULL FORM OF SPT & SMB? 7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT? 8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY? 9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND REMEDIAL MEASURES? 10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH? 11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB? 12.WHAT IS MEANT BY GANTRY GIRDER? 13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB? 14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT LENGTH? 15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR SHUTTERING?
What is m & 20.& what is fe&415.
how to prepare site mix design
What is ngl level and how it is transfer to column or beam??
What is the primary difference between adsorption and absorption?
Plz tell me...column and wall section drawing.
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
Define What are the reasons for geotechnical site investigations in Uganda?
Why we used ther red bricks for construction..
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?