Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


HOW TO MIX M20 GRADE CONCRETE BY HAND? USING BOND.



HOW TO MIX M20 GRADE CONCRETE BY HAND? USING BOND...

Answer / mdzaki uddin

1.6/5.5=.29*1440+417.6/50=8.35 bags of cement (1.6 is factor,5.5is ratio example m20 1+1.5+3=5.5,1440 =cement volume
sand=o.29*1.5=0.435 cum then 0.435*35.32=15.36 cuft,
course aggegate=0.29*3=0.87cum then 0.87*35.32=30.72cuft



my mobile no:9885815803 call any time royal civil

Is This Answer Correct ?    4 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer

0 Answers  


what is differences between ferrock and concrete ?

0 Answers  


how much steel required for 1 sq.m area?

24 Answers   AA Architects, L&T,


Why are pull-out tests performed for soil nails?

0 Answers  


How to do lineout of building

2 Answers  


wat is fe full form in fe4l5?

7 Answers  


The name Taapsee Pannu is associated with which film A) baar baar Dekho B) freaky Ali C) Rustom D) pink

1 Answers   HPSSSB,


define the engineering property of a soil. make a list of list property(properties)

2 Answers   AAI Airports Authority Of India,


what r you reqired for concrete baching plant?

0 Answers   Balaji, L&T,


Define the various stages of the project planning process in construction.

0 Answers  


Difference b/w tor steel or tmt bar

2 Answers   HCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)