what"s the formula find the cement consumption for brick
work 12 thick wall 1 m2?
Answers were Sorted based on User's Feedback
Answer / sha
mr.mahesh hw u get this .2128...is it multiply into m2...i
cant understand..pls advice
| Is This Answer Correct ? | 1 Yes | 0 No |
It's Depend on ratio of morter.
formula is very simple.
Quantity of wet material x 1.27 = Dry morter,
Example, let suppose wet material is 100cft then
100 x 1.27 = 127cft
requied material / some of ratio
if morter is 1:4 then
1/5 * 127 = 25.4 cft
25.4/1.25 = 20.32 say 21 bags
if thickness of plaster is 1/2" then it cover 508sft Area.
| Is This Answer Correct ? | 1 Yes | 0 No |
what is the difference between compaction and consolidation?
the min diameter of steel used in footing are
How to defind P.C.C. mix design according ratio & IS coad
what u mean by shoring?
16. What do you consider to be your greatest achievement so far and why?
Difference between the setting time and hardenin time of concrete
what is mean by c32/40s concrete class
how much volume is one bag cement of 50kg
15 Answers Portland, RJB, UltraTech,
from where ican get sample papers for CET-delhi 2012
Which is stronger solid steel rod or hollow steel pipe?
what is the hanekom repairing material after concreting work
Geometric Design Related Code name in India.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)