what"s the formula find the cement consumption for brick
work 12 thick wall 1 m2?

Answer Posted / dj_mgood

It's Depend on ratio of morter.

formula is very simple.
Quantity of wet material x 1.27 = Dry morter,
Example, let suppose wet material is 100cft then
100 x 1.27 = 127cft
requied material / some of ratio
if morter is 1:4 then
1/5 * 127 = 25.4 cft
25.4/1.25 = 20.32 say 21 bags

if thickness of plaster is 1/2" then it cover 508sft Area.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is shuttering co efficient?

1303


What are the alternate material for steel, Sand and aggregate

1834


When column of building is abutting the boundary line,then suitable footing advised is

1955


how we can find sieve #4 is 4.75mm?

1877


Which is the most prominent tower of world?

633






how can we calculate steel value, depending on load

1751


what is SDLC ?and write a 'c'program for to swapping the three numbers?

1397


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1790


How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently

2064


What is an object snap mode?

732


How long does it take concrete to harden?

668


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

4870


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1341


What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?

1975


How do you measure concrete?

769