Dear sir, What is the procedure for total station?How to calculate?..

Answer / kumars

TOTAL STATION IS AN INSTRUMENT TO DO SURVEY WITH CO-ORDINATES.
TOTAL STATION USES FOR GRID MARKING , LEVEL MARKING, BASICALLY IT IS A SURVEY INSTRUMENT ABOVE THE THEOD & LEVELING INSTRUMENT.


FROM KUMAR

Is This Answer Correct ?    17 Yes 2 No

Dear sir, What is the procedure for total station?How to calculate?..

Answer / sundarapandiyan

the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,

Is This Answer Correct ?    6 Yes 1 No

Dear sir, What is the procedure for total station?How to calculate?..

Answer / abhishek raj

TOTAL STATION IS BASCIALLY A SURVEY INSTRUMENT,WHICH IS USED
FOR LONG DISTANCE SURVEYING..!!!!

Is This Answer Correct ?    5 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What is cement-concrete ratio ?

4 Answers  


what is the weight of wet concrete?

8 Answers   ABB,


when will the position neutral axis shifted in beams

3 Answers  


Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)

0 Answers   L&T, Shoba Devlopers,


1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.

0 Answers   Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,






what is silica fumes or micro silica? and whr is it used? wat r its advantages?

10 Answers  


What is the average density of soil?

0 Answers  


How many kilograms of 12 mm coarse aggregate required in cufic feet for one cubic meter of M25 grade concrete

1 Answers  


What is Purpose Difference in Stirrups For Beam & Column  ? 

1 Answers   Arpee Group,


i want texture painting pwd data

0 Answers   Construction,


what should be the quantity of water in m20 cocnrete /per bag cement-- whats the formula

3 Answers  


Lapping Work Explain Briefly

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)