Dear sir,
What is the procedure for total station?How to
calculate?
Answer Posted / sundarapandiyan
the total station is instrument that used in surveying work. the instrument is must required 2 reference point for as a reference. the instrument is based on grape point like N and E point. it is used to provide marking of column . footing, beam even in curve, and road outer line and pipe alignment etc.,
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
how to calculate load bearing column
150mm bricks size how many use 4.14 m3
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
How to calculate construction cost of residential building in mumbai
Explain different types of rcc pipes.
Explain why concrete barriers have curved surface profiles?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what is escalation?how it is done?
What is the strength of 1:6:12 mix?
what is diffrence between catchment area,watershed and basin?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream