Doul Bar reinforcement and details of drawing.
No Answer is Posted For this Question
Be the First to Post Answer
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
for columns reinforcement the lap length is not provided then how to rebar the rods then how rebar should be lapped
4 Answers Nagarjuna Construction,
how much to get of BRC lapping in full yield and half yield ?
how much quantity of cement and sand required for construction of 10 cum brick work( Brick size 3"*4"*9"(Standard size ) an d for 10 cum construction of SSM (Size stone masonary) with Cm 1:6 for both.
11 Answers GRC, KEC, L&T, Techno Electric and Engineering, UPENN,
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
Why are steel plates inserted inside bearings in elastomeric bearings?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
convert 1 kilo into brass
Explain what is structural frames or systems?
sir what is the mean of WBM