how to control PQI (Project Quality Index)
Answers were Sorted based on User's Feedback
Answer / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
Is This Answer Correct ? | 4 Yes | 1 No |
How can i display 5 asterisk and another 5 asterisk )?
What is the density of steel?
what do you understand by M25 concrete
Which prize is the alternative to the NOVEL Prize?
how to check the quality of sand?
What is meaning of M25 grade
specifications of fe500 steel
what is the difference between mortar and concrete???
What should be the min.compressive strength of cc cube after 7 days testing and 28 days testing for M25 design mix conc.?pl give idea with relavant is code
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
how to calculate cost for MS plate shuttering (show calculation/assumptions)
where are using of one way slab ?