Answer Posted / pradip a. sarkar
As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How is the leaning tower of pisa supported?
can i get hindi version of is codes based on civil engineering?
How do you calculate load bearing capacity of a waffle slab?
What is the difference between linear dimension and aligned dimension?
how to calculate load bearing column
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
How do we test on design and style in a software?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
how much one carpenter can doing shuttering of slab in one day
How is calculate the cube molt
what is a well
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
Why the finite element method is lower bound solution?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L