As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is a kip?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
What is kn measurement?
What are the composition of a landfill?
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
Explain how you can turn off the display for dimension in CAD?
what is castigliano theaorem
what is tension footing?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
How many litres of water used for curing of 1000sqft of slav
Calculation of Pier Cap with tapper area?
how to calculate weight of 1.8 cum of aggregate
What are the benefits of rcc pipes over steel designed pipes?
What is the usage of zoom command?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???