how to control PQI (Project Quality Index)

Answer Posted / pradip a. sarkar

As per Deming,s Cycle PDCA
where P = Plan (what are the Plans)
D = Do (What to be done)
C = Check (As per Standard or Project Norm.)
A = Action ( If any deviation, take corrective, preventive Action for that)

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is the leaning tower of pisa supported?

648


can i get hindi version of is codes based on civil engineering?

3886


How do you calculate load bearing capacity of a waffle slab?

2219


What is the difference between linear dimension and aligned dimension?

638


how to calculate load bearing column

3063






Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1176


How do we test on design and style in a software?

681


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

1581


how much one carpenter can doing shuttering of slab in one day

2885


How is calculate the cube molt

1795


what is a well

1509


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

1477


Why the finite element method is lower bound solution?

2318


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1972


A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

1565