What would be the quantity of cement:Sand:Aggregate (1:2:4)
requirement for slab casting measuring 1mtr x 1mtr x 0.10
mtr (4 inches)?
Answer / vipin kumar saini
Quantity of concrete in this slab= 0.1cum (and now quantity of sand =0 .0217cum(32 kg) and quantity of sand =0.0434cum and gravel quantity= 0.0868 cum)
| Is This Answer Correct ? | 1 Yes | 0 No |
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
clear cover for concrete structures as per BS
What is the force exerted by the tacoma narrows bridge?
1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?
1:6 ratio block work purpose how much cement used
1 Answers Spago, VRC Constructions,
A ground is nonengginered fill 15 years back; how we can find the level of consolidation and bearing capacity
what is the hanekom repairing material after concreting work
What is the capacity of Maharashtra in power generation by winds?
5 Answers MPSC, State Bank Of India SBI,
wha is frog?
what is the safe bearing capacity of hard murum? can we consider it 50 ton?m2
how to calculate sump capacity
2 Answers AVS, KMC, Personal Assistant, Shrey Associates,
What is the Hardness of M-40 grade concrete, general and theoratical
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)