Answer / gajanand solanki

For Programming a PLC
1.First you should have PC . Then Appropriate software
Then Appropriate cable may be RS232,USB or Ethernet net
if you PLC Support that.
2.You should have knowledge of that software like
Programming in Ladder,SFC or Instruction List.

Is This Answer Correct ?    30 Yes 3 No

What is require for PLC Programming?..

Answer / akash

1)should know the application of program properly
2)A pc with appropriate software.
3)should know any programming language (LAD,STL)
4)should know all inputs and outputs properly

Is This Answer Correct ?    8 Yes 1 No

What is require for PLC Programming?..

Answer / neeraj sharma

1. should have a pc
2. should have a plc
3. should have network such as RS232 (Allen Bradley)
4. should have communication cable to communicate b/w plc & pc
ex. PM02 , CP3 etc
5. should have driver software
6. should have knowledge of programming (ladder logic , FBD , Structral text)

Is This Answer Correct ?    4 Yes 1 No

What is require for PLC Programming?..

Answer / carl_ellis

You'd all fail my class for failure to mention these three
things:

- A project scope document
What is to be controlled, alarmed, displayed and
communicated? What is the purpose and what are the
functional criteria for the project? What are requirements
for acceptance of the project? What limits the
dreaded 'scope creep' ("Oh, I thought it would
include . . ." or "we need to add this")

I tell my pupils that the homework problem description
constitutes the 'scope' for purposes of a class, but in the
real world it might be a 400 page scope document, but
whatever form it takes, they should never accept a verbal
description, but should insist on a written document,
because that's what defines whether their programming meets
the standard of having been done properly.

- An I/O list is absolutely essential. What are the
inputs, what are the outputs?

- The PLC's documentation
Nobody remembers all the little syntax or functional
details. It's up to the programmer to look this stuff up
because in the real world, there's no 'teacher' to answer
the question about the timer's minimum interval.

Those three things are essential. Lack of any of the 3
constitutes negligence.

Lack of mention of any of the 3 ?in the 5 answers already
posted tells me your instructors are book people, not real
world PLC programmers.

------------------------------

Carl Ellis, Measure First

Is This Answer Correct ?    2 Yes 0 No

What is require for PLC Programming?..

Answer / parmar jayesh

plc program is reqired for an appropriate output from an
specific input.

Is This Answer Correct ?    5 Yes 5 No

What is require for PLC Programming?..

Answer / kailash luhar

input module, CPU CPU, POWER SUPPLY, outputn module. leader
logic.

Is This Answer Correct ?    8 Yes 10 No

Post New Answer

More Instrumentation Interview Questions

Hi,can anyone help me out with PhD programs related to Instrumentation field?I have a degree in electronic Instrumentation?

0 Answers  


ON RADAR INTERFACE LEVEL TRANSMITTER IF DI-ELECRIC IS WRONG WITH CONTINIUS PROCESS THAN HOW CAN INDENTIFY OR HOW CAN I PUT NEW DI-ELECTRIC VALUE?(ROSEMOUNT-TDR-3300-COXIAL PROBE TYPE)

1 Answers   Chevron Phillips,


why we use -ve voltage in vibration monitoring system.generally we use 4 to 20 mA as output of instrument then why we use voltage in vibration

2 Answers  


How can I zero check of wet leg type DP Tx ?

6 Answers   ONGC,


what is rtd

4 Answers   Petrofac,






Whether the DI, DOs shields can be connected with Analog Input Shield Earthpit?

0 Answers  


How much flow is passing through 6 inch line? There are no gauge, no any transmitters in line.

3 Answers  


What are the interlocks we have to check during the start up of LP/HP compressor?

0 Answers   Hamsco,


please explain smoke detectore & lel detector?what is o/p

1 Answers  


difference b\w a transducer and a sensor

4 Answers  


How to connect another 24 volt dc power supply in circuit when previous power supply has become weak.what is the connection?

2 Answers   Bhole Baba Dairy Industries,


In split range control, we will control 2 outputs with time interval. Eg :(with 4-20 ma signal, for 4-12 ma we are operating one control instrument like valve & for 12-20ma we are operating other control instrumet (other valve). If we get a signal of 15ma to first instrument (Valve 1), what will happened to the first valve, and if we get signal above 20 ma to 2 valve what will happened ?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)