What is require for PLC Programming?
Answers were Sorted based on User's Feedback
For Programming a PLC
1.First you should have PC . Then Appropriate software
Then Appropriate cable may be RS232,USB or Ethernet net
if you PLC Support that.
2.You should have knowledge of that software like
Programming in Ladder,SFC or Instruction List.
Is This Answer Correct ? | 30 Yes | 3 No |
Answer / akash
1)should know the application of program properly
2)A pc with appropriate software.
3)should know any programming language (LAD,STL)
4)should know all inputs and outputs properly
Is This Answer Correct ? | 8 Yes | 1 No |
Answer / neeraj sharma
1. should have a pc
2. should have a plc
3. should have network such as RS232 (Allen Bradley)
4. should have communication cable to communicate b/w plc & pc
ex. PM02 , CP3 etc
5. should have driver software
6. should have knowledge of programming (ladder logic , FBD , Structral text)
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / carl_ellis
You'd all fail my class for failure to mention these three
things:
- A project scope document
What is to be controlled, alarmed, displayed and
communicated? What is the purpose and what are the
functional criteria for the project? What are requirements
for acceptance of the project? What limits the
dreaded 'scope creep' ("Oh, I thought it would
include . . ." or "we need to add this")
I tell my pupils that the homework problem description
constitutes the 'scope' for purposes of a class, but in the
real world it might be a 400 page scope document, but
whatever form it takes, they should never accept a verbal
description, but should insist on a written document,
because that's what defines whether their programming meets
the standard of having been done properly.
- An I/O list is absolutely essential. What are the
inputs, what are the outputs?
- The PLC's documentation
Nobody remembers all the little syntax or functional
details. It's up to the programmer to look this stuff up
because in the real world, there's no 'teacher' to answer
the question about the timer's minimum interval.
Those three things are essential. Lack of any of the 3
constitutes negligence.
Lack of mention of any of the 3 ?in the 5 answers already
posted tells me your instructors are book people, not real
world PLC programmers.
------------------------------
Carl Ellis, Measure First
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / parmar jayesh
plc program is reqired for an appropriate output from an
specific input.
Is This Answer Correct ? | 5 Yes | 5 No |
Answer / kailash luhar
input module, CPU CPU, POWER SUPPLY, outputn module. leader
logic.
Is This Answer Correct ? | 8 Yes | 10 No |
Hi,can anyone help me out with PhD programs related to Instrumentation field?I have a degree in electronic Instrumentation?
ON RADAR INTERFACE LEVEL TRANSMITTER IF DI-ELECRIC IS WRONG WITH CONTINIUS PROCESS THAN HOW CAN INDENTIFY OR HOW CAN I PUT NEW DI-ELECTRIC VALUE?(ROSEMOUNT-TDR-3300-COXIAL PROBE TYPE)
why we use -ve voltage in vibration monitoring system.generally we use 4 to 20 mA as output of instrument then why we use voltage in vibration
How can I zero check of wet leg type DP Tx ?
what is rtd
Whether the DI, DOs shields can be connected with Analog Input Shield Earthpit?
How much flow is passing through 6 inch line? There are no gauge, no any transmitters in line.
What are the interlocks we have to check during the start up of LP/HP compressor?
please explain smoke detectore & lel detector?what is o/p
difference b\w a transducer and a sensor
How to connect another 24 volt dc power supply in circuit when previous power supply has become weak.what is the connection?
2 Answers Bhole Baba Dairy Industries,
In split range control, we will control 2 outputs with time interval. Eg :(with 4-20 ma signal, for 4-12 ma we are operating one control instrument like valve & for 12-20ma we are operating other control instrumet (other valve). If we get a signal of 15ma to first instrument (Valve 1), what will happened to the first valve, and if we get signal above 20 ma to 2 valve what will happened ?