Why would an Engineer consider combining FEEDBACK and
FEEDFORWARD control in some applications?
Answers were Sorted based on User's Feedback
Answer / gonzales
In boiler when tripple element controlling required
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / nikhil
In some applications, the compensation provided by feedback control is not sufficient.
Also, the feedforward control is faster but it is difficult to predict all the manipulated variables.
Hence a combination of both is used.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / r.murugan
Feed forward control required three inputs like drum level
control (steam flow,drum level,feedwater flow
closed loop control with feedback only applicable
Is This Answer Correct ? | 1 Yes | 0 No |
How to Calibrate Transducers? Can you give me a step by ste procedure?
Please tell me details about Sox,Nox,SWAS analyser????
Can please tell mi about SIOS, PRM, SERVER, and what is the diference between PIN LAN, PCS LAN,APC Server, and please send the Doc if possible for referance,mail id patil_amit17@yahoo.com
Which of the following instruments consumes maximum power during measurement?
what is the advantage by using PID controller than P& PID?
steps for installing orifice plate?
0 Answers Bhushan Power Steel,
please send me hpcl placement papers
What s the exact height of installed transmitter?
Q- Ordinary Water Tap is which kind of controller ? P , PI or PID i chose the option of ON - OFF type controller but ambiguity is that for different positioning of tap we get different flow
whats the working principle of level transmeter?
How to derive IO Count (AI, AO, DI and DO ) from a Field instrument (FI) Bill of Quantities (BOQ) given by client.
What is the differace between Volumatric flow meter and Mass flow meter.