2. In a container filled with each of the following
materials, at a porosity of 40%, determine the upward
gradient required to cause the quick condition (a) Lead
shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c)
Sand with a G = 2.32
No Answer is Posted For this Question
Be the First to Post Answer
What is meant by dimensioning?
How do you calculate the surface area of the paver blocks, in oreder to find out the compressive strength of the same ?? And which codes are used for testing of paver blocks ?
1 Answers BP Sangle Constructions, ECMAS,
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
give the full form for upvc pipe & cpvc pipe
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
How to build the floor to ceiling bookcase?
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
What is the difference between dumpy level and auto level.
what is SDLC ?and write a 'c'program for to swapping the three numbers?
what is the difference between replacement of cement by groundnut shell ash
punj loyed and sapurjl palanjl
WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)