how can we design dia of
rainwater pipes ? plez explain
by using formula ?
Answer / rafeez
Q= AXV
A = area in m2 T/4x d2
v = velocity m/s
q = discharge m3/s
we know about velocity of water and discharge of water
ex q =2 m3/s v= 1 m/s
Is This Answer Correct ? | 3 Yes | 0 No |
calculate for 1 m3 cement, sand, coarse agree gate ,kg?
How to find the thickness of RCC concrete ex.10'x10'. what"s the thickness, we provide and what"s the formula?
What will be the maximum length of RCC Lintels?
Whats maxi. slump of M-7.5 Concreit for PCC
2 Answers Indiabulls, Swastik Group,
How much percentage of silt contain maximum allowed?
use ofr concrete as per grade ?
how bridge design is to be start? what is the preliminary step for design? which code of practice is to be used for design? what r the methods used for design? what r the ivestigation r carried out? what r the design criteria for design and loading conditions?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
0 Answers Amit Enterprises, ICT,
how can we calculate the quantity of cement, sand, aggregate in any concrete mix
how material can be calculate for brick work in 1:6
Definition of plinth beam & Uses.