If the t/f capacity is 500KvA then what is Amps ratting of
the main breaker.

Answers were Sorted based on User's Feedback



If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / rekha.k.m.

It's 800A set at 665A

Is This Answer Correct ?    5 Yes 1 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / santosh k b

800 Amps( Rekha k m answer ok)

Is This Answer Correct ?    2 Yes 1 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / thiru arasu

the above one is right,.

Is This Answer Correct ?    0 Yes 0 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / athar abid

As we Know that

KVA = Sqrt 3 . Voltage(V) . Current(I)

Now for 400V (Phase-Phase) syayem

I = 500KVA/(1.732 * 400)
=500*1000/(1.732*400)
=721.7 Amps

There is no standard breaker available with this rating, so
take one step above rating i.e. 800Amps

Hope its clear.

Regards
Athar Abid

Is This Answer Correct ?    1 Yes 1 No

If the t/f capacity is 500KvA then what is Amps ratting of the main breaker...

Answer / krishna reddy

2000Amps

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

Dear sir, I am working in wind mill division , pls explain Pls explain in details with formula My question is Wind speed 3.5 M/s Gen RPM is 1500 ( 25 K/w Production ) Wind speed 12 M/s Gen RPM is 1500 ( 220 K/w Production ) Why in 3.5 m/s generation was low , why in 12 m/s generation was high , Pls dont explain wind force or wind density , that one already i know For the above question RPM was same why the KW was different Answer : 1. Its depends on the density ( Force ) of the air Sir , Pls explain wit Formula sir

1 Answers   Vestas,


what is transient voltage?

0 Answers  


Is motorized MCCB required rotatory handle

1 Answers  


what is use of reactive power in ac ckt.

2 Answers  


calculation of knee point voltage of current transformer?

2 Answers   TATA,






1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.

0 Answers  


What is sunrise meeting ?

1 Answers   KSEB,


How will you explain transformer action in case of 3-phase induction motor?

4 Answers  


Why two nos. un-tensioned wires are placed inside the PSC poles used by powergrid in RGGVY works.

2 Answers   Bhel, Power Grid,


how to select power and control contactor .

1 Answers   Bhel,


why ac can not be stored?

5 Answers  


WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT

3 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)