In power plant synchronizing time (synchroniging meter
should be 12'o clock position only. why not 6'o clock
position not possible.
That is its normal position i.e. zero voltage position
Is This Answer Correct ? | 1 Yes | 0 No |
Why the motor take high starting current for long time(10- 15 sec) which is connected to Blower as compaire with a motor which is connected with pump with same rating?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers
in a dc motor we supply current only to the armature conductors,from where is the field winding gets excited then??
what efficiency at 70% loaded transformer
WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.
What are the electrical engineer roles and responsibilities in chemical plant?
what is the fuction of electrical transducer in control pannel?
how much up to LT Voltage range?
How to test Power Transfomer vector group in the field?
what is the saturation point of crgo lamination.
What is vector group? What is meant by DYN11?Why is it needed?