how quantity of much blocks, cement and sand is required to
complete 1sq.m of CC Hollow blockwork
Answers were Sorted based on User's Feedback
Answer / srinivas.maradana
if hollow block is measurment .200x.300x.15
9 blocks sand .2354 cement i:6 is 63 kgs
| Is This Answer Correct ? | 3 Yes | 9 No |
I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.
what is stress?
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What do you mean by honeycomb in concrete?
Where are laterally loaded piles are used in practice?
how does I measure the unit weight of steel?
Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)
toothpaste is non-newtonian or newtonian
PERT Chart
What is a bearing capacity of soil?
why cylinder for split tensile strength test ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)