1)What is the total volume of aggregates required for
1cu.mtr.solid hard concrete?
2)What is total mass of wet concrte and dry concrete after
28 days of M25?
3) Is 28 days strength is the final strength of concrete or
it gets increasing as the time period increses.?
4)What is the volumetric proportion of concrete grade of
M25.M30,M35,M40
No Answer is Posted For this Question
Be the First to Post Answer
what is the procedure of steel?pleas tell me how we can apply in any home or building?
what is water cement ratio and how to calculate it after designing the concrete?
Where is the worlds longest elevator and how long is it?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?
how to calculate valuation for the old building?
what is called super elevation of the road?
How will be cutting in timber plate size 600*400 column size
What is the Compressive strength of concrete C40/20 at 7days
What type of foundation preferred in sandy soil ?
what is curtailment in rebars
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.