Answer / pramod d.gaur
Three element means to control three parametes,i.e.
feedwater flow in to the drum, steam flow and level
control of drum,now in a three element, the set point of
level control track the ratio of steam flow to the
feedwater flow,i.e, as much as amount of steam flow flow
out of drum or in other word steam consume by process
equall amount of feedwater flow in to the drum.In such
cases there is very least chances that water from the drum
get carried away with steam in to the turbine when there is
load fluctuation
Regards
Pramod D.gaur
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / ajeet pal singh
As steam flow and feed water flow effects the level of
boiler drum these two are taken as two elements in three
element control system to achieve smooth control on drum
level ideally these two are capable to maintain the drum
level but the third element as drum level actual itself is
taken to compensate various leakages etc. As we know the
controller doesn't respond unless it senses some error
between PV and SV and if drum level actual is taken alone to
control the drum level, controller will respond only if
level goes up or down to its set point and this will
maintain always a pulsating drum level instead of a straight
line. Steam flow and feed water flow consideration gives a
feed forward effect to controller hence a smooth control on
drum level can be achieved
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / kmns kiran
Three element control is just for better controlability of drum level with feed water incoming flow, steam output flow & drum level
In case of any bad signal from feed water & steam flow (BDQ) , then control will go to single element drum level control.
Plant will not trip
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ramachari
three element is between the feed water flow,steam flow and drum level.Mainly it is decides the how much of amount feed water is required with steam flow and vice versa with no variation of the drum level and will take the compensation of the temp and pressure.means it will maintain the drum level with the three parameters level,presuusre,temp also.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / kul bhushan emecon controls
In Power Plant three element control is always required
because when Load changes then steam flow will change vice
versa drum level & flow of feed water will change to manage
the action between all three perameters we require three
element control.Otherwise due to any mismanage between all
three plant will trip.
| Is This Answer Correct ? | 0 Yes | 3 No |
two common seiling liquid used in seal pots are:
What is mean by Ethernet, Device net and Control net? For what application we are using these?
What is the standard height for stancion supports?
why k factor is important to know in flow transmitter. if we don,t know k factor what will be issue we can face .
1 Answers Flour Tech Engineers (P) Ltd,
We have ZR22G-100-S-A-E-T-T--E-A/CV/F1 Model Zirconia Oxygen analyser which is Yokogawa make. I kept the analyser in Flue gas path at Air pre heater area. My plant is 7.5MW Biomass power plant. For a particular fuel, Coconut Husk which contains Sodium and Potassium chlorides iam not getting proper reading, Analyser output always Zero. I calibrated the analyser and it is OK. For Other fuels like Wood chips, Cholam waste, DOB, Groundnutshells, Ply wood waste and all iam getting actual percentage of Oxygen. What is the main reason behind this draw back?
What is Cavitation?
In Boiler Drum Level- Level control valve how can it tuning (PID)?
what is interlock system and why we use of this?
You wish to SINK all my digital inputs to a PLC digital input card. Would you common out the leads to a positive or a negative connection?
I am working in a process industry, in that there are several sections devided in the SCADA screens and individual sections may START independently. But sometimes i am facing problem i.e, if section 2 Stopped by the operator immediately Section 1 or Section 3 or Section 4 is getting stopped can you expain the reason behind this?
what is the full formof HART
please give me the syllabus and sample questions if possible for Instrumentation for Vizag Steel plant MT (Trainee) 2009 exam
1 Answers Pedvak, Steel Plant, Vizag Steel,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)