If i have 200 test cases and we have to execute but we
don't have time to execute all testcases.within 1 hour we
have to execute that testcases and prepare the test
report.so how i have to resolve this problem? is there is
any technique in the testing.

Answers were Sorted based on User's Feedback



If i have 200 test cases and we have to execute but we don't have time to execute all testcas..

Answer / amiya nandi

divide the test case among the members present so that time can be consumed..

Is This Answer Correct ?    2 Yes 0 No

If i have 200 test cases and we have to execute but we don't have time to execute all testcas..

Answer / amjathk

we can execute this scenario by different methods

1. we can combine two or many test case into one test case and execute like scenarios which are parallel - disadvantage: this method can only be executed by a person who has written all test case.

2. the person who deep knowledge on the product can test with in given time(SME)

3. we can use 'all-pair testing' techniques to decrease the test case count, but doesn't exclude the scenario's.

Is This Answer Correct ?    1 Yes 0 No

If i have 200 test cases and we have to execute but we don't have time to execute all testcas..

Answer / k.prakashchandra

Random selection.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

When the power Factor (p.f)is lead then how the Voltage can rises?

1 Answers  


Transformer Secondary maximum current (max. load)

3 Answers  


WHAT IS SUBSTATION & ACCORDING TO VOLTAGE HT,EHT SUBSTATION EXPLAIN IT

0 Answers  


i(1)= j0.5 p.u., i(2)= -j0.5 p.u., i(0) =j1 p.u. What kind of fault it is-- a)l-l ,b)l-l-g, c)l-l-l-g, d)l-g.

2 Answers   Areva,


what is differnce between grounding and earthing or both are same?

3 Answers  






what is difference between megger & Contact resistance meter & its Application?

2 Answers  


how a.c. genarator control power factor when its conected to grid supply by incrising or decresing excitation voltage.

1 Answers  


what is the voltage present in the telephone?

10 Answers   Infosys,


what rectifiers is and what are the types of rectifiers?

0 Answers  


what is the difference between single phase, 2 phase, and 3 phase in electric meter?

1 Answers  


Suppose a 3 phase, 2 pole, 440V induction motor is driving a flywheel of 600mm diameter, 150kg mass. By using v-belt and pulley, the speed is increased to 4500 RPM. What will be the effect on motor current?

0 Answers  


what is residuel magnetism

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)