What are the points to be considered for calculating cement
reconciliation.
a)Do we need to deduct the wt of cement bags
b)Do we need to adjust the qty due to wt loss during
transportation, loading unloading etc or else each bag can
be considered as 50 kg bag
c)What is the proportion of mix cover block making.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

how can we calculate steel value, depending on load

0 Answers  


Generally construction is based on which method:limit state of working stress

3 Answers   Mars Planning Engineering Services, Sterling Wilson,


How is rate analysis prepared for M 25 grade of concrete?

4 Answers  


Which apparatus done steel (bar) tension test

1 Answers   Kesri Construction,


What is the usage of zoom command?

0 Answers  






What is the stripping time of shuttering for PPC concrete

1 Answers  


The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl

1 Answers  


how much % of steel use in footing, slab, column

18 Answers   Bhel, Matrix,


plz tell me the compresive stength of genral con. & foam con. all grade after 7,14,21,28 day

1 Answers  


How will you determine the capacity of a reservoir with help of contur

3 Answers   Triveni,


what isIS code no for preparation of BAR BENDING SHEDULE (BBS)

4 Answers   BBS, Transstroy,


we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)