What are the points to be considered for calculating cement
reconciliation.
a)Do we need to deduct the wt of cement bags
b)Do we need to adjust the qty due to wt loss during
transportation, loading unloading etc or else each bag can
be considered as 50 kg bag
c)What is the proportion of mix cover block making.
No Answer is Posted For this Question
Be the First to Post Answer
how can we calculate steel value, depending on load
Generally construction is based on which method:limit state of working stress
3 Answers Mars Planning Engineering Services, Sterling Wilson,
How is rate analysis prepared for M 25 grade of concrete?
Which apparatus done steel (bar) tension test
What is the usage of zoom command?
What is the stripping time of shuttering for PPC concrete
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
how much % of steel use in footing, slab, column
plz tell me the compresive stength of genral con. & foam con. all grade after 7,14,21,28 day
How will you determine the capacity of a reservoir with help of contur
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?