why is negative range given to measure the steam drum level

Answers were Sorted based on User's Feedback



why is negative range given to measure the steam drum level..

Answer / sreekanth

Because of the wetleg compensation. In the drum the high
pressure is at the lower tap and Low pressure is at the
Upper tap. The wetleg is connected to the Upper Tap and the
DP across the taps will be -ve if there is no drum level.
so the range of the transmitter will be -XXX to 0 mmwc.

Is This Answer Correct ?    31 Yes 5 No

why is negative range given to measure the steam drum level..

Answer / ranjan

but in drum, pressure is equal in all area

Is This Answer Correct ?    3 Yes 13 No

Post New Answer

More Instrumentation Interview Questions

If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?

0 Answers   Essar, Reliance,


How r the calculation of process line mpm.

0 Answers   Bhushan Power Steel,


Before erect the instrument what should you do?

3 Answers   L&T,


how to calibrate TT transmitter

3 Answers  


hello friends, can you please send me the model paper or question paper to be prepared for hpcl examinations????????? You can mail me at rahim_here@yahoo.com waiting for your reply........... help me .. plz.....

0 Answers  






flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty

0 Answers   ONGC,


what is the essential difference between DIODE and SCR in term of application.

2 Answers   ADMA OPCO,


For an Instrumentation Engineer, is there any effect on Instruments of safety zones like zone0, zone1, zone2. As an instrumentation Engineer, what we have to consider or remember while working in these areas.( zones 0,1,2).

1 Answers  


WHAT IS THE MASS FLOW FLOW METER

4 Answers   Reliance,


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

0 Answers  


what is Instrumentation?

5 Answers   RCL, TCS,


why we use cascade control and feed foreword control in 3 element control of boiler drum ?what is feed forward and cascade control system ?

0 Answers   Visa Steel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)