How to calculate cut bar length of steel reinforcement?
Answers were Sorted based on User's Feedback
Answer / khalid
deduct the cover of structure & add L length & dedeuct
2d*no of bends.
Is This Answer Correct ? | 95 Yes | 12 No |
Answer / p.h.deshmukh
Deduct concrete cover and deduct 1 x dia. (for bend of
other than 90 degree) or 2 x dia. (for bend of 90 degree)
for single bend as applicable from Drawing length of bar.
Is This Answer Correct ? | 57 Yes | 11 No |
Answer / shan ummer
Cutting length of steel
L= length of structure
H = height
c = clear cover
d = dia of bar( steel)
In cuttting lenth of footing steel
L+H-(6*50mm)+d+(2*2*d)
please check the above method is it correct
Is This Answer Correct ? | 14 Yes | 7 No |
Answer / satya.mvvs
it depends on dia, angle of bends and elongation of bar.
Generally it can be calculated as
Effective Length (L) of Bar - No of bends x 2d or 3d
For 45 degrees angle it may considered as 2d and
for 90 Degrees it may considered as 3d
In practically it may be applicable to higher dia bars only
(Above 12mm)
Is This Answer Correct ? | 14 Yes | 11 No |
Answer / srinivassan
50 times diameter of the rod
lap lenght ex: 20 mm rod lap length - 50*20 = 1000/300= 3.33
Is This Answer Correct ? | 13 Yes | 17 No |
Answer / surender reddy
Ex: length = 1.5mts
cover =50mm
l bend = 300mm
ans:= 1.5-(2x50)-2(2xd)-d
Is This Answer Correct ? | 16 Yes | 23 No |
Answer / jk mohanty
Just deduct the cover of the beam and add L-length as
mention in the typical drawing
Is This Answer Correct ? | 34 Yes | 47 No |
what is the standard gradient or slope for drainage?
Cement sand mortar ratio 1:6 and 1:3. In canal lining 10mm & 16mm respectively done after 24hrs difference between them . Tell me Torrence limit of above ratio after 1 Year .
what grades of reinforcement steel are available in market
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How is the leaning tower of pisa supported?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
Why I-section is preferred to channel section?
What is the benefit of making a cantiliver proped.?
7 Answers CCCL, Engineers India Limited,
how much one carpenter can doing shuttering of slab in one day
what do you mean by ssd how it calculated
how many shuttering material required for 100 sqm