What are the advantages and disadvantages of screw harmatic
chiller respect to centrifugaal chiller machine?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate motor bearing life - cycle (life time) (SKF bearing) how determine the capacity of refrigeration system? how we use condenser coils, compressor, capillarity,compressor how determine the capacity of refrigeration system? how we use condenser coils, compressor, capillarity,compressor what is rigging
give the function of thermostat
A very strange fault i cam across today,that i never experienced not studied before, i need an answer for this. Phase to phase or line to line , L1,L2 & L3, voltages are 490VAC, but if i use line to ground , its again 490 VAC. . . whats the fault and theory behind of it?
can any one pls refer me any sites which have notes regarding Body-in-white(welding fixtures)...pls
Explain the otto cycle in brief.
why water's critical point is 4*c ?
Define Overall Heat transfer coefficient.
what is the actual difference between casting and moulding? explain pressure die casting process?
WHO ARE YOU
37 Answers L&T, MBT, TATA, TCS, Wipro,
I have a Hitachi split unit 1.5 Tr but I want know that what is meaning of R-134a refrigerant and what is chemical formulla.
1 Answers Balkrishna Industries Limited BKT, Hitachi,
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is the purpose of scrapper ring
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)