Advantages of servers over normal desktop in PLC SCADA
system
Answer / senthil
Server are manufactured for the long run ( 24x7) and industrial usage ( conditions like temperature, humidity etc). comparative in high standard of parts are installed and with redundancy in the all parts.
| Is This Answer Correct ? | 0 Yes | 0 No |
How to find the range of DP cell Transmitter for measurement of level in closed vessel.
Whether the DP transmitter can be utilised in the medium of Vaccum for the measurement of Level?
why two probes are used in turbine flowmeters?
what is the essential difference between DIODE and SCR in term of application.
Is SmartPlant Instrumentation taking advantage of the quality assurance procedures within Intergraph?
why the discharge pressure of ID fan showing negative at fan running condition.(boiler operating condition.)
Can anybody tell me the exact explanation for Functional calibration?When it should be done on process or on lab? Advanced Thanks
What is difference between loop and zone ?
what is meaning of software redundency and hardware redundency?
POSSITIVE PULSE IS APPLIED TO AN INVERTER INPUT.THE TIME FROM THE LEADING EDGE OF THE INPUT TO THE LEADING EDGE OF THE OUTPUT IS 10 ns. THE TIME FROM THE TRAILING EDGE OF THE INPUT TO THE TRYLING EDGE OF THE OUTPUT IS 8 ns. WHAT ARE THE VALUES OF tPLH and tPHL?
how to draw a flowchart for swapping two numbers using bit wise operators?
What are the questions asked in fresher instrumentation candidates
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)