I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL
I RECEIVE CALL LETTER FOR THE SAME.
No Answer is Posted For this Question
Be the First to Post Answer
What is critical path method (c.p.m)?
What is is code for use TOR
Deshuttering time for slab 6.15 meter
How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?
state the main objectives of underpinning
Minimum size of the particles of silt soil
what is the technical word for column and beam joint
how to calculate the cement, sand, coarse aggregate required for one cubic meter of concrete?
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
What is civgl engg?
Basic civil interview questions
How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)