How to replace dia of bar in beam like 25mm 3no.S at bottom
But due to some reason on site 25mm bar is not available
Then is it ok to provide 20mm 4no.S? Give description or
Formula to calculate area of steel and replacement?
Answers were Sorted based on User's Feedback
Answer / iqbal
Due to some reasons required diameter of steel is not available then we required to compensate the availability of steel at site. i,e if 25 mm 3nos to 20mm the formula is
total area of 25mm steel X nos of rods Divided by area of 20mm dia of one rod
| Is This Answer Correct ? | 37 Yes | 0 No |
Answer / krishna
Dia of bar pi/4*d2* no of bars.
If u replace the bars So pi/4*d2
:dia of bar/ replace of bar gives the total bars of available
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / manoj kumar
The formula or the thumb rule for finding of no of bars with spacing .
Let the d= dia of the bar which is to be provided at the place of given bar.
D= dia of given bar in the drawings.
Spacing = d2/D2x(given spacing of bar in dwg.)
for Eg.
d=20, D=25 spacing=200
s=(400/625)x200=128
| Is This Answer Correct ? | 12 Yes | 10 No |
distinguish between under reinforced and over reinforced beams?
How much sand for a 1000 sqft residential building ?
What is the Requirements of indoor & outdoor Substation Construction? What is the main Safty Requirements for SubStation Construction?
What are the ingredients of pre-stressed concrete?
brick work 1cum kitne cft hote hai
Why we use pcc in foundation?
how to identify the failure of building by expansive soils
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What is allowable limit of silt in river sand for concrete
1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
What is "L" provided at the base of column??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)