why we are discharging h.t supply during shutdown time
Answer / hemant kumar
in sub station when we worked to inspect the faults or any
short of work we discharge h.t supply to DISCHARGE LINE
CHARGE because it is danger to work(400kv).......
| Is This Answer Correct ? | 2 Yes | 2 No |
What is a thermocouple, and it working principle?
what type of load we can give to motor shaft?
what is the function of starter & choke in the tube light set & how choke give 1000 volts while switching on.
14 Answers ADNOC Abu Dhabi National Oil Company, IBM,
1.what is surge used in power system 2.what is switching used in power system 3.what is lightning used in power system
What are the site acceptance tests for power cables, DG Sets, LT panels & 30kVA UPS ?
Why the starting current in Induction Motor is very high as compared to normal rated current ????
How can I calculate per unit (KWH) fuel (Gas/ Diesel both) consumption 1MW unit?
which network topology offers the greatest level of tolerance?
What is Procedure the procedure to select CT's & PT's in 66kV and above substation?
3 Answers Infotech, Vijai Electricals,
operation of diesel generator
how much up to LT Voltage range?
The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)