The building has 12 columns of 12x9 in 3 rows of 4 each in
a plot of 50'x30', The central row is strengthened with
16mm twisted rods. The roof area is 1500 sft including
balconies. calculate the load factor per sft. Also
indicate the number of roofs the building can withstand.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

For raft 3000mm thickness with T25150 mesh reinf in top and bottom what diameter can be used for chair to support mesh reinforcement

4 Answers  


What is the density of cement?

10 Answers  


calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick

0 Answers  


how much cement consumption in 1 sqmt of wall cleading work (dedo)?

4 Answers  


Difference between ton and metric ton

3 Answers   DHA, ECCI,






1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3

12 Answers   Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,


DEAR ALL I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN? MY QUESTION IS WHAT IS THEPRESENT SAFETY POSITION IN AFGAN? HOW IS THE COMMUNICATION AND BANKING FACILITIES IN AFGAN? HOW IS THE CLIMATE ABOUT AFGAN? ANYBODY KNOW ABOUT THE ABOVE DETAIL PLS TO SENT THE ANSWER. IF YOU ARE INTRESTED TO SENT THE ANSWER PERSONALLY PLS TO CONTACT MY MAIL ALSO. @ santhoshselvamani@gmail.com

2 Answers  


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

0 Answers  


what are the Task work of different labour.?

0 Answers  


what is the formula for calculating volume of isolated footing? i am not asking for the sloped footing, i am asking for normal rectangle isolated footing, pls add diagram or linkof diagram with answere

0 Answers   Private,


What is themeaning of TBM in civil construction

7 Answers  


what is the standard gradient or slope for drainage?

1 Answers   IGC, SPL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)