How much steel required in 1 square feet slab?
Answers were Sorted based on User's Feedback
Answer / pramansrivastava
.75 kg to 1.1 kg steel required for 1sqft slab.
| Is This Answer Correct ? | 138 Yes | 22 No |
Answer / sudhir patil
its totally depend on the design of that perticular
structure.Normally its seen that G + 7 structure is having
2.8 to 4 kg per Sft & High rise building having 9 to 12 kg
per sft.
| Is This Answer Correct ? | 48 Yes | 15 No |
Answer / babar
It is only depend that which dia of bar in slab is being used
| Is This Answer Correct ? | 19 Yes | 3 No |
Answer / karthick
it is depended upon the structural design but normally for a nominal slab with single floor it is 1.3 to 1.5 kg of steel is used
| Is This Answer Correct ? | 20 Yes | 7 No |
In multistory building
----------------------
1- Raft + Retaining wall (In case basement)--- 8kg/sqft
2- basement roof slab i/c non tower slab,
( Column from basement floor to stilt floor + basement roof
slab slab)-- 6.5kg/sft
3 - typical floor / for each floor ___ 4.5kg/sft
| Is This Answer Correct ? | 17 Yes | 7 No |
Answer / waseem khattak
you can only assume or can calculate from structure drawing
normaly 30 ton steel required for 1 kanal plot with basement
and rcc wall
| Is This Answer Correct ? | 3 Yes | 5 No |
Answer / faizan
i think the 1 sq fit area is consume of 1.5 to 2 kg/sq fit
| Is This Answer Correct ? | 5 Yes | 7 No |
What are the methods to do a estimate.
PL.tell me about civil engineering questions with answer
importance of the soundness test to determine the quality of cement use for any construction
i Have Completed a Intermediate Vocational (Construction technology) with Bridge course ,iam elegible to join in Institute of Surveyors(india).
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
where should the lap of a beam should be
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
what is a steel formula
Fly ash is residue generate from??
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
what is meant by pqc
2 Answers APCO, Sunil Hitech Engineers,
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)