If the output of a 100kva, 415v generator is stepped up to
11kv with a 500kva transformer,can the transformer be
Loaded above the source generator loading?
Answers were Sorted based on User's Feedback
Answer / m.aqeel
no main thing is ur source so our system can bear only
source rated power.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / kushal parikh
Transformer can be loaded upto 5 times as generating source is 100kVA and transformer is of 500kVA. Other source can be added by putting it on same bus.
Let me know if i'm wrong.
Is This Answer Correct ? | 0 Yes | 0 No |
i am confused about generator. i have generator of 380 KVA that is 304 KW by that formula KW=KVA*0.8... then by this formula I=KW/V*1.732*0.8 the amperes are 528.673. so that is the load which i put on one phase of generator or this is total 3 phase load on Generator.......
How is earthing done in Aerospace applications such as Flights and spaceships..?
I PURCHASED A DEISEL GENARATOR SET OF AVR TYPE& RATING 125KVA BUT SOME TIMES THE OUTPUT VOLTAGE IS FLUCTUATING WHAT ARE THE PROBABLE REASONS GIVE ME
if reactive power become zero in transmission system then what effect on system.???
In Aeroplane what circuitry or method use for earthing?
9 Answers Bhel, EDA, Wind World,
Star Delta Diagram with full description
0 Answers SKS Microfinance, Syscom,
How to obtain B license from TNEB license board. What is eligibility?
How can we calculate single phase load into three phase load
Difference between earthing & grounding.?
why transformer are rated in KVA not in watt?
what is difference between 2 pole structure and 4 pole structure in transformer yard
how snubber circuit works to protect switching devices?