What are the loading factors to be considered for
transformer sizing/selection?
Answers were Sorted based on User's Feedback
Answer / omar aziz
1. Maximum Demand
2. Downstream equipment starting characteristics
3. Total downstream kVA
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / aaman samal
for the selection of transformer the following points are
necessary
1. power demand
2.power factor
3.load factor and types of load
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / abhishek robinson
Thermal Loading of transformer
Fault Current
| Is This Answer Correct ? | 2 Yes | 1 No |
Why does inductive loads consume KVARs?
why cable i burning without tripping. how can protect led street lights
if 40 watt bulb has higher resistance then a 100watt bulb then according to joul farmula p=I^2R the 40 watt bulb more power consume then 100 watt bulb.
Why we use the D-curve MCBs in critical power distrubution.
Why restricted earth fault protection is needed? Why can’t differential Protection is sufficient?
what is the difference between surge arrestor and surge supressor
electricity board have asked me what size meter i need fitted in my garage, its a 415volt supply and i want to run six 20amp supplies tolifts and things plus ten florry lights , what kva meter do i need??
why the capacitor bank unit is kvar
How to model "IF ELSE" statement in matlab simulink?
What is the meaning of loop in transformer
Sir, Please tell me that how I will calculate the efficiency of rectifier. Because input is ac and output is dc. Is it right to put two unlike signal together.
We have 11kV/110V three phase indoor potential transformer in 66/11kV Sub-station, where the failure of PT is frequently happening and the rating of the PT is 0.2 class accuracy, with primary star and seconday (two cores) star connected. Some experts has suggested to not to connect the PT Primary neutral to the ground because when transformer neutal NCT connection is loose; the faulty current will flow through the PT primary neutral, resulting into failure of PT. My question is: Is it necessary to remove the primary neutral connection of the PT from ground? if not, what would be the reason for failure of PT. Please guide me.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)