what is mean by tremie concrete
Answers were Sorted based on User's Feedback
Answer / pradeep
Tremie concrete is placing of concrete by tremie pipe for
piling work where concrete compaction done by movement of
pipes up and down. Slump is very high for such concrete.
Is This Answer Correct ? | 12 Yes | 3 No |
Answer / senthil
tremie pipe method is used for underwater concrete
construction...
Is This Answer Correct ? | 11 Yes | 3 No |
Answer / sekar.k
Tremie concrete means,The concrete delivered through the
pipe (tremie pipe), Generally tremie concrete usefull in
pile foundation (pile).The size of the pipe not less than
200mm.for this type of concrete 20mm aggregate to be used.
Is This Answer Correct ? | 3 Yes | 0 No |
Previous IS steel code?Thanks.
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What is the strongest bridge for a school contest?
What is difference between engineering stress and true stress?
How do I calculate the ground is resested for a 5 floor building?
what"s the responsibilities for QC(quality controler)in high rise buildings?
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
How to calculate sand,cement for 1:5ratio brick masonary
4 Answers IVRCL, Jamek, Prera Nirman Sewa, SPCL,
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
Why the finite element method is lower bound solution?
which tie is used in binding of steel double tie or single ti?
what is project planning