What should be the values of settling time, peak time,
steady state error, overshoot, rise time, MPOS (Maximum
percent over shoot) to keep the system in transient state,
to keep the system in steady state ?
No Answer is Posted For this Question
Be the First to Post Answer
how much UPS neutral erath leakage current.
What’s electric traction?
can i connect REF and Differencial relay in 1 CT core for transformer protection?
What is shunt voltage and u v voltage witch one best
avr is an automayic voltage regulator ... it regulates voltage before it synchronise with grid after synchronisation it regulates power factor why....
what is "PE" earthing? and what do u know abt 16mm cable?
can u give me a brief idea about power line carrier communication ??
For 132 KV line, PT or CVT which is prefered for measuring & protection? is there any IS or IEE standard available?
What is method of calculating the fault current for a MDB, 50KW, 3PH, 415V, 50HZ?
why DC is not generated instead of AC?
Explain how you decide what size of electrical wire do you need?
how mach PF mainten in DG
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)