what is the maximum percentage of crush sand in mix
design.also what is the difference betweeen grite powder &
crush sand.

Answers were Sorted based on User's Feedback



what is the maximum percentage of crush sand in mix design.also what is the difference betweeen gr..

Answer / prabhat kumar shahi

frist in the crush sand 100% passing threw 4.75 m.m. sieves
& retain 85%in 150 microns & this manufacture from crush by
rock.and grit powder passing threw 150 microns sieve 50%
generally now 50% to 60% use in mix-design. nest year used
100% VSI crush sand MIX-DESIGN we are produce.

Is This Answer Correct ?    7 Yes 4 No

what is the maximum percentage of crush sand in mix design.also what is the difference betweeen gr..

Answer / sanjay u ojha

crush sand are made by rock in majority. however near the
source of river it is produce by sand pebbles. crush sand by
pebble are almost round in shape however of rock is angular.
sand using pebble can be used 100% for concrete and of rock
shall be @50 yo 70%. However due to ban in maharashtra by
environment dept, now a days 100% crush sand are used for
mix design.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

10 Answers   ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,


In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment

5 Answers   Power Grid,


what is the difference between highway and motorway?

0 Answers  


What are causes of cracks in outside plaster of a building and how we prevent it during constructions?

6 Answers  


why primer application is required before applying putty

3 Answers   Ramky,






What is called dummy column, & what its uses ?

6 Answers   IGCAR,


Why does the pressure increase under soil?

0 Answers  


how to calculate the runner (2*3) qty in cft. the length is 8 feet.

6 Answers   CCCL, Gammon, Greenko, L&T,


how can we design dia of rainwater pipes ? plez explain by using formula ?

1 Answers  


what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.

0 Answers   bscpl,


HOw much % of premium on DSR-2013 currently

0 Answers   NICE,


How can we improve the capacity of a existing foundation?

2 Answers   Student,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)