In an industries, they are using different load. If we are
using single DB for lighting and power means, the variation
of load when we are using will affect the input voltage.
The lighting load is the uniform load and small. But the
power load will varry according the usage. For better
maintanence both DB's are provide separately and providing
the separate size of input cables.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / lijesh p k
In an industry,various loads are used for various
purposes.Lighting loads are usually small and UNIFORM.But
in the case power loads they vary as per the usage which
may affect the input voltage.So to safeguard against faults
and for easy maintenance different DB's are used for
lihgting and power in industrial wiring.
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / bidesh biswas
TO MAKE AN ELECTRICAL ISOLATION BUT TO MAKE MAGNETICALLY
COUPLED THROUGH 1:1 (APPROX) LIGHTING TRANSFORMER.
| Is This Answer Correct ? | 1 Yes | 3 No |
difference between alternator & GENERATOR
What are the technical reasons for soaking transformers for various times before allowing them to pick load after a fault ?
How the real power output is controlled in a Generator?
please give me all the Alarm .Trip ,Safety Relays & Conditions of Chiller mail me on ashokbabunhce@gmail.com
I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?
which type of material is used for making motor encloser
Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.
0 Answers Engineers India Limited,
how to set the time in digital timer ?
acb(AIR CIRCUIT BREAKER)NOT CHARGING AUTO
BSNL TTA EXAM QUESTION
WHICH SUPPLY IS BETTER FOR 4 MW LOAD. 1)TO TAKE NEARER AVAILABLE 11 KV SUPPLY OR 2)TO TAKE 33 KV SUPPLY WHICH IS AVAILABLE AT 10 KM DISTANCE BY INVESTING NEARLY 50-60 LACKHS
What is Harmonics how it is produced and what is the method to control the same
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)