How does a system control centre in a utility plant gets
the grid frequency of the electrical network (50 Hz or 60
Hz)by the SCADA system?
Answer / jim
SCADA does not control frequency. The source generators produce at 60 cycle. The ultimate load on the grid will never be perfectly matched with the generation. This load mismatch will control the grid frequency by + or - from 60 cycle. Your wall clocks will change speed.
Is This Answer Correct ? | 0 Yes | 0 No |
Is it true online ups having bypass mode if it is true then why we called ups because it is interrupting power when goes in bypass mode
what is the difference between Resistance VS capacitance
Is there any specialised book to refer about fault level calculation both in MV and LV side??
what are the points to be consider for MCB(miniature circuit breaker selection?
how to decide the ratings of the MCCB,MCB in electrification.give me the proper thumb rule or procedure.
what is the clear formula to calculate cable size for a load
What is vcb?
what will happen if frequency is below 50 hz?
What is OLTC in transformers and what is its function?
if we have a power factor 0.99 and we add a capacitive bank with it then what happen?
How to calculate transformer capacity requirement for a project site?
How to synchronization will be done between two DGs ?