What is the deffernce bet. Instrumentation and Electrical
Enginerring?
Instrumentation is all about measurement and control of
industrial processes like flow, pressure, level, density,
viscosity and so on. This is done with various sensors in
the plant that are calibrated by instrument technicians
according to the relevant process or application. The
readings of these sensors are then send to a central control
room via a world standard 4 to 20 mA signal and 24VDC, where
a monitoring supervisory system displays the information on
a computer screen. Control room operators interact with
these computer screens and stop and start pumps in the field
by clicking with the mouse on a small drawing on the screen
of the relevant pump. How this is done is with SCADA or DCS
software normally programmed by the instrument technician as
well. Instrumentation consists of only two sections, the
field side and the software side. Most instrumentation
technicians can do both.
Electrical work is done by a electrician and is all about
main power supply and distribution to the complete plant
either by using power from the main grit or local power
generators on the plant. Normally instrument technicians
will work on up to maximum 110VAC, a electrician can work
on any kind of power low or high. Only qualified high
voltage electricians are allowed to do high voltage
switching since this can be very dangerous to to.
Good luck
Is This Answer Correct ? | 4 Yes | 0 No |
what is the difference in Kg/cm2 and mmwc?
how many types of orifice plates?and explain about it?
what is the name of thermocople element cable from field to pannel end?
can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know
what is the difference between attemperator and desuperheater ?
How do you identify between actual alarm and false alarm in a Temperature Transmitter in SCADA based Control System
in my company organisation in plan to take new PLC system for replacing old relay system , for that what I/P needsd to submit to the system house of PLC supplier?
why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .
A RANGE OF TRANSMITTER IS (0-400)B mm abs what is "B"?
i want to know the interview format fot gail, instrumentation. pls answer me in habib.sami1003@gmail.com
What is PDS and PDMS ?
A pressure Tx accuracy is 0.2%. Signal o/p is 4-20ma.span is 16 Ma.how many deviate the o/p then calibration needed