what are all the different manufacturing scenarios in pp?
Answers were Sorted based on User's Feedback
Answer / kartik
There are three scenarios in PP
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
Is This Answer Correct ? | 44 Yes | 5 No |
Answer / amit naik
There are different scenarios in SAP PP module.
1)Make to stock
2)Make to order
3)External processing (Subcontracting)
4)Rework processing
5)Prodcution in another plant
Is This Answer Correct ? | 43 Yes | 11 No |
Answer / prabhu
There are 3 different manufacturing Scenarios in PP (ie)
1.Dis create manufacturing
2.Repetitive manufacturing
3.Process
Is This Answer Correct ? | 20 Yes | 1 No |
Answer / sathya
Generally there are three types of manufacturing Scenorios
will discussed in sap pp i.e
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
In the above three types we have different scenorios that
is:
a)Make to stock
b)Make to order
c)External processing (Subcontracting)
d)Rework processing
e)Prodcution in another plant etc..
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / manoj
There are different scenarios in SAP PP module.
1) Make to Stock and Make to Order. as per business process we are using different planning strategics, Mainly we are using, for Make to stock 10 and 40, 11- for REM, and 20- for MTO.
2) Subcontracting 2 Types mainly, Operation Subcontracting and Assembly Subcontracting,
3) General Rework Order, Job Work Order,
4) Planning and Production plant different
5) Production order Splatting with Product cost Collector.
6) Phantom Assembly,
7) Co-Product, and By product.
8) Collector Order consent,
=- Capacity Planning,
9) Serial Number, with Batch Management,
10) SOP, MRP, LTP, MPS,
11) Quota Arrangement in Production Order with Production Version, more small small scenarios we are using in PP, mainly Descartes Mfg, and REM,
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / selvaganesh a.
Discrete,repetitive,project based manufacturing
Is This Answer Correct ? | 9 Yes | 3 No |
Answer /
1.Discreate Manufacturing
2.Repetative Manufacturing
3.Process Manufacturing
Is This Answer Correct ? | 7 Yes | 4 No |
Answer / batheiah
There are different scenarios in SAP PP module.
1)Make to stock
2)Make to order
3)External processing (Subcontracting)
4)Rework processing
5)Prodcution in another plant
Is This Answer Correct ? | 4 Yes | 7 No |
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
Explain LTP.
What are basic dates?
what is baseline configuration
Explain different inspection type you used .
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is Alternative BOM?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What is the use of mrp pp evaluations?
What is mrp list and what is the use of it?
How is indian slab and us slab?